RIVERWORKS FIELD SERVICES — COMMISSIONING RECORD Site: Municipal River Station 14 (R14) Work order: RW-26-1842 Controller: RW-EDGE-4 / serial R14-0427 Commissioned: 2026-06-02 Technician role installed: fieldtech Checklist revision: 4.2 ACCESS HANDOFF [x] Enrol station device certificate [x] Verify operator certificate from municipal console [x] Create field-service account: fieldtech [x] Issue temporary handoff password: river14 [ ] Replace temporary password with site-specific credential before acceptance [ ] Record credential rotation in municipal vault ticket [x] Disable unused serial console after burn-in RADIO AND SENSOR BUS [x] Confirm LTE failover registration [x] Confirm level transducer on bus address 0x31 [x] Confirm turbidity probe on bus address 0x47 [x] Compare level against staff gauge (difference: +0.01 m) [x] Compare turbidity against field standard (difference: -0.4 NTU) MAINTENANCE POLICY Scheduled remote window: Tuesdays 08:00–10:00 local station time Emergency access requires an incident ticket and operator acknowledgement. The field-service account is password-backed until certificate migration. HANDOFF Technician initials: JL Municipal witness: M. Chen Acceptance status: CONDITIONAL — outstanding access-handoff items remain Next review: 2026-06-09